Skip to content
Professional Estimating LLC

Core

Tender Estimating Services in New Zealand

What is tender estimating services?

Professional Estimating provides tender estimating services across New Zealand. We measure 8 scope items for tender work from your PDF, DWG or Revit drawings, deliver an Excel quantity schedule and marked-up PDF plans in 2–5 business days, and confirm a fixed fee in NZD before any work starts.

Measured quantities, a clear scope and a list of qualifications delivered before your tender closes, so you can bid more work without more staff.

Get a QuoteView a SampleTypical turnaround: 2–5 business days

Tendering takes time, and most of that time is measuring. Builders and subcontractors often have more tenders on the table than they can price, so they skip good jobs or rush the takeoff and carry the risk. We do the measuring so you can focus on rates, margins and winning the right work.

For each tender we read the documents, measure the quantities, list what is included and excluded, and flag anything unclear. You receive the quantities in a format you can price straight away, along with a list of tender queries to send before the deadline.

We work to your deadline. Tell us the closing date when you upload the documents and we will confirm a delivery date that leaves you time to get subcontract prices and finalise the bid.

Scope

What do we measure in a tender takeoff?

ItemUnitWhat it covers
Document reviewlistDrawings, specification and tender conditions read for scope and risk.
Measured quantitiesm² / m³ / lm / no.All trades or your trades only.
Scope inclusionslistWhat the price covers, by trade.
Exclusions and qualificationslistItems to exclude or qualify in the bid.
Tender querieslistQuestions to send before the deadline.
Subcontract packagesscheduleQuantities split ready to send to subcontractors.
Provisional items$ / qtyAllowances for undesigned or unclear work.
Pricing templateExcelQuantities with open rate columns for your pricing.

Deliverables

What do you receive?

Tender packages include quantities, a scope list, qualifications and queries, arranged so subcontract packages can be sent out the same day.

Download the full estimate summary sample (PDF, 30 KB)

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Who is this estimate for?

Builders
Bid more tenders without adding estimating staff.
Subcontractors
Get trade quantities quickly enough to price before the head contract deadline.
Developers
Check tendered prices against an independent measure.
Architects
Find document gaps before the tender is issued.

Process

How does a tender estimate run?

  1. STEP 01

    Upload plans

    Upload the tender documents and tell us the closing date.

  2. STEP 02

    Scope confirmation

    We confirm the scope, trades to measure and a delivery date.

  3. STEP 03

    Takeoff and review

    Quantities are measured, checked and arranged into subcontract packages.

  4. STEP 04

    Delivery

    You receive quantities, scope list, qualifications and queries before the deadline.

New Zealand context

Which NZ standards apply?

Many New Zealand tenders run on short windows, often two to three weeks for the whole bid. Subcontractors need their quantities early in that window, so we prioritise splitting the measure into packages you can send out quickly.

Public sector tenders follow the Government Procurement Rules and are often advertised on GETS. These usually have fixed query deadlines, so we list document questions early enough to be asked before the query period closes.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of tender work?

  • 01

    Tender window

    Short windows need the measure early so subcontract pricing has time to come back. We plan delivery around your closing date.

  • 02

    Document quality

    Incomplete tender documents need more qualifications and provisional items, which affects how competitive the bid can be.

  • 03

    Contract conditions

    Liquidated damages, retentions and special conditions change the risk in a price. We flag unusual terms we find in the documents.

  • 04

    Scope boundaries

    Unclear splits between the head contract and separate contracts can lead to items being priced twice or not at all.

Where do tender estimates go wrong?

Subcontract coverage is another weak point. A head contractor's bid is only as good as the subcontract prices behind it, and trades that receive drawings without quantities often price late or not at all. Splitting our measure into packages lets you send each trade a clear schedule early, which usually means more prices back before the deadline and fewer gaps that have to be covered with your own guesswork.

Tenders are often lost or won on what was left out. Rushed takeoffs miss items, and a bid that looks competitive becomes a loss on site. We check the measure against the specification so the scope is complete.

Qualifications are another weak point. A bid with no qualifications carries every risk in the documents, while one with too many looks non-compliant. We list the items that genuinely need qualifying.

Finally, tender queries are often sent too late. Most tenders close the query period days before the closing date, so we identify questions in our first pass through the documents.

FAQ

Tender Estimating Services: frequently asked questions

How fast can you turn a tender around?

Usually two to five business days, depending on size. Tell us the closing date and we will confirm.

Do you price the tender?

We provide quantities and scope. You apply your own rates and margins, or we can add indicative rates.

Can you measure only my trade?

Yes. Subcontractors often order a single-trade measure for a tender.

Do you help with tender queries?

Yes. We list unclear or missing information as queries for you to send.

Is our tender information kept confidential?

Yes. Tender documents and your pricing are never shared.

Related services

  • Construction Estimating

    A complete, trade-by-trade cost estimate built from your drawings, so you can price, tender or test feasibility with confidence.

  • Quantity Takeoff Services

    Measured quantities from your drawings, itemised and traceable back to every marked-up sheet, ready for you to price.

  • Bill of Quantities Services

    A full bill of quantities measured trade by trade, so every tenderer prices the same described scope and their prices can be compared line by line.

  • Commercial Fit-Out Estimating

    Office, retail and hospitality fit-out estimates with partitions, ceilings, joinery, finishes and services adjustments measured from the interior design.

Get a quote

Send your plans for a tender estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us