Skip to content
Professional Estimating LLC

Project Type

Renovation & Alteration Estimating Services in New Zealand

What is renovation and alteration estimating?

Professional Estimating provides renovation and alteration estimating across New Zealand. We measure 8 scope items for renovation & alteration work from your PDF, DWG or Revit drawings, deliver an Excel quantity schedule and marked-up PDF plans in 3–5 business days, and confirm a fixed fee in NZD before any work starts.

Renovation, extension and alteration estimates that separate strip-out, making good and new work, with stated allowances for what is hidden.

Get a QuoteView a SampleTypical turnaround: 3–5 business days

Renovations are harder to price than new builds because part of the work is hidden until the walls come down. Rot, old wiring, missing insulation and out-of-level floors are common in older New Zealand homes, and an estimate that assumes everything is sound will almost always be short.

We measure alterations in three parts: removal and strip-out, making good to the existing building, and the new work. Splitting it this way shows where the cost really sits and makes it easier to compare builders' prices, which often bundle these together.

Where the drawings cannot tell us the condition of existing work, we include stated allowances, for example for replacing a percentage of framing in a bathroom or upgrading a switchboard. These are listed so they can be confirmed or removed after site investigation.

Scope

What do we measure in a renovation & alteration takeoff?

ItemUnitWhat it covers
Strip-out and demolitionm² / itemLinings, fittings, walls and finishes to be removed.
Disposalm³ / loadWaste removal including skip hire.
Structural alterationsitem / lmNew openings, beams and posts where walls are removed.
Making goodm² / lmPatching linings, floors and ceilings to the existing building.
New workm² / no.Extensions, new rooms, kitchens and bathrooms.
Services upgradesitemRewiring, replumbing and switchboard work where required.
Hidden condition allowances$ / %Rot, asbestos and other unknowns stated separately.
Protection and temporary worksitemWeather protection and protection of retained areas.

Deliverables

What do you receive?

Renovation estimates show strip-out, making good, new work and risk allowances as separate totals so each can be reviewed.

Download the full estimate summary sample (PDF, 30 KB)

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Who is this estimate for?

Builders
Price alteration work with risks visible to the client.
Subcontractors
Quote their part of a renovation with clear quantities.
Developers
Budget refurbishment of existing buildings before purchase.
Architects
Give homeowners a realistic budget before detailed design.

Process

How does a renovation & alteration estimate run?

  1. STEP 01

    Upload plans

    Send existing and proposed plans, plus photos of the existing building if you have them.

  2. STEP 02

    Scope confirmation

    We confirm the scope of removal, retained areas and known site conditions.

  3. STEP 03

    Takeoff and review

    Strip-out, making good and new work are measured separately, with risk allowances added.

  4. STEP 04

    Delivery

    You receive the estimate, assumptions and a list of items to check on site.

New Zealand context

Which NZ standards apply?

Under section 112 of the Building Act 2004, an altered building must continue to comply with fire and access provisions at least to the same extent as before, and some alterations trigger upgrades. Councils may require improvements to means of escape or accessibility as part of the consent, which should be allowed for.

Many New Zealand homes built before 2000 may contain asbestos in linings, flooring or cladding. Under the Health and Safety at Work (Asbestos) Regulations 2016, an asbestos survey is required before refurbishment or demolition work. We include an allowance for the survey and list removal as a provisional item until the result is known.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of renovation & alteration work?

  • 01

    Age and condition

    Older homes are more likely to need rot repair, rewiring, replumbing and re-levelling, all of which add cost beyond the visible scope.

  • 02

    Structural changes

    Removing load-bearing walls or adding a storey needs engineering, new beams and foundations, and often temporary support.

  • 03

    Living in during works

    Staging work around occupants adds protection, cleaning and time to the job.

  • 04

    Code upgrades

    Alterations may trigger upgrades to fire, access or insulation that were not part of the original brief.

Where do renovation & alteration estimates go wrong?

Renovation budgets most often fail on hidden conditions. If an estimate has no allowance for rot, old wiring or uneven floors, it is assuming the best case. We state allowances clearly so the client can see the risk.

Making good is the second gap. Every removed wall leaves a floor, ceiling and adjoining walls to patch and repaint, and matching old finishes takes time.

Finally, temporary works such as weather protection, propping and dust control are often left out, especially on extensions where the existing roof is opened up.

FAQ

Renovation and Alteration Estimating: frequently asked questions

How do you price what you cannot see?

With stated allowances for likely hidden work, listed so they can be confirmed after investigation.

Do you include asbestos removal?

We include the survey and list removal as a provisional sum until results are known.

Can you price extensions?

Yes. Extensions are measured as new work with the connection to the existing building.

Do you need existing plans?

They help. If not available, measured photos and a sketch can work for smaller jobs.

Do you cover heritage buildings?

Yes, with allowances for specialist materials and methods where required.

Related services

  • Residential Estimating

    Estimates for new homes, townhouses, alterations and additions, measured from your consent drawings and laid out the way builders price.

  • Demolition Estimating

    Demolition and strip-out quantities by material, with disposal volumes and hazardous material allowances shown separately.

  • Carpentry Estimating

    Measured carpentry scope beyond the frame: decks, cladding installation, interior trim, stairs, doors, hardware and fit-off.

  • Finishes Estimating

    The fit-out that clients notice: tiling, splashbacks, cabinetry, fixtures, accessories and fit-off, measured from the finishes schedule.

Get a quote

Send your plans for a renovation & alteration estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us