Bill of Quantities Estimating Services in New Zealand

What is bill of quantities services?

Professional Estimating provides bill of quantities services across New Zealand. We measure 8 scope items for bill of quantities work from your PDF, DWG or Revit drawings, deliver an Excel quantity schedule and marked-up PDF plans in 5–10 business days, and confirm a fixed fee in NZD before any work starts.

A full bill of quantities measured trade by trade, so every tenderer prices the same described scope and their prices can be compared line by line.

Get a QuoteView a SampleTypical turnaround: 5–10 business days

A bill of quantities lists every item of work in a project with a description, unit and quantity, ready for contractors to price. When all tenderers price the same bill, their prices can be compared line by line, and variations during construction can be valued against the tendered rates.

We prepare bills from the full drawing and specification set. Work is grouped by trade section, from preliminaries through earthworks, concrete, framing, cladding, roofing, linings and finishes to services and external works. Each item has a clear description that refers back to the drawings and specification clauses.

We can deliver a fully measured bill, or a trade bill for selected packages where you want the rest priced on a lump sum. Either way, provisional sums and prime cost sums are listed separately with their basis stated.

Scope

What do we measure in a bill of quantities takeoff?

ItemUnitWhat it covers
Preliminaries and generalitemSite establishment, supervision, scaffolding and temporary works items.
Measured trade sectionsm² / m³ / lm / no.Every trade measured with full item descriptions.
Provisional quantitiesas measuredWork not yet fully designed, marked for remeasurement.
Provisional sums$Defined and undefined sums with their basis stated.
Prime cost sums$Supply allowances for selected items such as appliances or fittings.
Item codingref.Codes cross-referenced to drawings and specification clauses.
PreamblestextMeasurement notes explaining how items were measured.
Tender summary$Collection pages and a summary for tenderers to complete.

Deliverables

What do you receive?

Bills are delivered in Excel for tenderers to price, with a PDF issue copy and marked-up drawings showing what was measured.

Download the full estimate summary sample (PDF, 30 KB)

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Who is this estimate for?

Builders
Tender with a measured basis and use the rates to value variations.
Subcontractors
Price their trade section without measuring from scratch.
Developers
Compare tenders like for like and control variations.
Architects
Issue a measured tender package with the documents.

Process

How does a bill of quantities estimate run?

  1. STEP 01

    Upload plans

    Send the full drawing set, specification and any consultant documents.

  2. STEP 02

    Scope confirmation

    We agree the bill structure, sections and items to be provisional.

  3. STEP 03

    Takeoff and review

    Each trade is measured and described, then the whole bill is checked for gaps between trades.

  4. STEP 04

    Delivery

    You receive the priced-ready bill in Excel and PDF with the measurement notes.

New Zealand context

Which NZ standards apply?

In New Zealand, bills are commonly measured in line with NZS 4202, the standard method of measurement for building works. Following a known method means contractors understand exactly what each item includes and how it was measured.

Bills sit well with NZS 3910 contracts, where variations are often valued using the rates in the contract. A clear bill gives both parties a fair, agreed basis for valuing changes during the job.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of bill of quantities work?

  • 01

    Document completeness

    A bill can only be as complete as the drawings. Gaps become provisional items, which carry pricing risk until they are resolved.

  • 02

    Number of trades

    Projects with many trades and specialist packages take longer to bill and need careful checking at trade boundaries.

  • 03

    Description detail

    Clear descriptions reduce tender queries and pricing variation. Vague descriptions lead to qualified tenders.

  • 04

    Provisional sums

    Large provisional sums reduce price certainty. Measuring more of the work reduces them.

Where do bill of quantities estimates go wrong?

Measurement notes are often missing as well. Without preambles explaining what each item includes, tenderers make their own assumptions, prices drift apart and disputes follow during the job. Our preambles set out how each trade was measured, what labours are deemed included and where quantities are provisional, so every tenderer reads the bill the same way and variations can be valued fairly against the tendered rates later.

Bills often fail at the boundaries between trades. Flashings, fixings, penetrations and making good can fall between two sections and get priced by nobody. We check each boundary as part of the final review.

Another problem is relying on provisional sums for work that could be measured. Every provisional sum is a price that was not competed for, so we measure what the drawings allow and keep sums for genuinely undesigned work.

Finally, preliminaries are often thin. Site establishment, supervision, scaffolding and temporary works can be a significant share of the cost, so they are itemised for tenderers to price.

FAQ

Bill of Quantities Services: frequently asked questions

Do you follow a standard method of measurement?

Yes. We measure in line with NZS 4202 unless you ask for a different structure.

Can you bill only some trades?

Yes. We can prepare trade bills for selected packages.

Do you price the bill?

We can provide a priced copy for your own budget check, and an unpriced copy for tender.

How are undesigned items handled?

As provisional quantities or provisional sums, clearly marked and explained.

What format do tenderers receive?

Excel with locked descriptions and open rate columns, plus a PDF copy.

Related services

  • Quantity Takeoff Services

    Measured quantities from your drawings, itemised and traceable back to every marked-up sheet, ready for you to price.

  • Cost Planning Services

    Elemental cost plans that follow your design from concept to tender, so the budget is tested at every stage rather than at the end.

  • Tender Estimating Services

    Measured quantities, a clear scope and a list of qualifications delivered before your tender closes, so you can bid more work without more staff.

  • Commercial Estimating

    Measured estimates for offices, retail, fit-outs and mixed-use buildings, packaged by trade so you can tender subcontractors cleanly.

Get a quote

Send your plans for a bill of quantities estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us