Skip to content
Professional Estimating LLC

Envelope & Interiors

Painting Estimating Services in New Zealand

What is painting estimating?

Professional Estimating provides painting estimating across New Zealand. We measure 8 scope items for painting work from your PDF, DWG or Revit drawings, deliver an Excel quantity schedule and marked-up PDF plans in 1–2 business days, and confirm a fixed fee in NZD before any work starts.

Paintable surface areas by substrate, system and coat count, with doors, trims and features measured for labour and litres.

Get a QuoteView a SampleTypical turnaround: 1–2 business days

Painting is priced on surface area, but labour is driven by the details: the number of doors, the lineal metres of trim, the height of ceilings and the type of substrate. A quote based on floor area alone misses most of that.

We measure painting surfaces by substrate and system: plasterboard walls and ceilings, timber weatherboards, fibre cement, masonry, metal and timber trims. Each area is matched with its paint system and number of coats, so you can calculate both litres of paint and hours of labour.

Doors, windows, frames and trims are counted and measured separately. Exterior work notes height and access, because scaffolding or elevated work platforms can change the price significantly.

Scope

What do we measure in a painting takeoff?

ItemUnitWhat it covers
Interior wallsm²By room, substrate and finish.
Ceilingsm²Flat and raked ceilings by finish.
Doors and framesno.Each side counted, with frames and architraves.
TrimslmSkirtings, architraves, scotias and window reveals.
Exterior claddingm²By cladding type, with height bands.
Exterior joinery and trimslm / no.Facings, barges, fascias and soffits.
Metalworkm² / lmBalustrades, gutters and downpipes.
Paint quantitiesLCalculated from area, coats and spread rates.

Deliverables

What do you receive?

Painting estimates include a paint schedule by system and colour group, with estimated litres, so suppliers can quote materials directly.

Download the full estimate summary sample (PDF, 30 KB)

Itemised quantity sheetExcel + PDF
Marked-up plansColour-coded PDF
Material and labour scheduleExcel
Assumptions and exclusions listPDF

Who it is for

Who is this estimate for?

Builders
Check painting quotes on a new home against a measured scope.
Subcontractors
Painters can price labour per room and order paint with confidence.
Developers
Budget for repainting the exterior of a multi-unit property.
Architects
Understand the maintenance and cost effect of paint-finished claddings.

Process

How does a painting estimate run?

  1. STEP 01

    Upload plans

    Upload floor plans, elevations, sections and the painting specification.

  2. STEP 02

    Scope confirmation

    We confirm paint systems, coat counts, substrates and access requirements.

  3. STEP 03

    Takeoff and review

    Surfaces are measured by system, doors and trims counted, and totals checked against floor area.

  4. STEP 04

    Delivery

    You receive the painting schedule, paint quantities, PDF and marked-up plans.

New Zealand context

Which NZ standards apply?

AS/NZS 2311, the guide to the painting of buildings, is widely referenced in New Zealand specifications for surface preparation and paint systems. We use the systems in your specification, which often reference it.

Older homes may have lead-based paint, which needs safe removal and containment. Where repainting an older building is in scope, we note that testing is recommended and can include a provisional allowance.

We measure and price to the drawings. Design compliance and building consent remain with your designer and building consent authority.

Cost drivers

What drives the cost of painting work?

  • 01

    Surface preparation

    New plasterboard needs less preparation than an older surface with cracks, peeling paint or lead paint. Preparation often takes longer than painting.

  • 02

    Number of colours

    More colours mean more cutting in, more masking and more product. Feature walls and contrast trims add time.

  • 03

    Height and access

    Two-storey exteriors and high ceilings need scaffolding or platforms, which add cost and time.

  • 04

    Paint system

    Premium paints, specialist coatings and extra coats add material and labour. The specification controls this.

Where do painting estimates go wrong?

Painting is often priced on floor area, which ignores the number of doors, the lineal metres of trim and the height of the ceilings. These details drive labour.

Preparation is the other common miss, especially on repaints. Sanding, filling, priming and dealing with old paint can take longer than painting itself, and should be allowed for explicitly.

Exterior work adds weather risk. Paint cannot be applied in rain, on damp surfaces or in very cold conditions, so exterior repaints in winter can take far longer than the same job in summer. We note the exterior areas separately from interior work so you can programme and price them differently, and so a client can see why an exterior quote changes with the season. We also separate high-level work, such as gable ends and stairwell walls, because it needs ladders, planks or scaffold and is slower than work that can be reached from the floor. Masking joinery, protecting floors and cleaning up are further tasks that take real time on every job.

FAQ

Painting Estimating: frequently asked questions

Do you calculate litres of paint?

Yes. Litres are calculated from area, number of coats and manufacturer spread rates.

Do you count doors separately?

Yes. Doors are counted by type and each face is included.

Can you estimate exterior repaints?

Yes, from elevations or photos with dimensions. We note assumptions about preparation and access.

Do you include scaffolding?

We note height bands and can include access allowances. Scaffolding is often priced separately.

Can you measure feature walls or special finishes?

Yes. Feature finishes are measured separately from standard paint.

Related services

  • Drywall Estimating

    Plasterboard wall and ceiling areas by board type and system, converted into sheets, fixings and stopping for ordering and labour.

  • Finishes Estimating

    The fit-out that clients notice: tiling, splashbacks, cabinetry, fixtures, accessories and fit-off, measured from the finishes schedule.

  • Flooring Estimating

    Floor finish quantities by room and material, with roll and plank layouts, trims, underlay and subfloor preparation.

  • Residential Estimating

    Estimates for new homes, townhouses, alterations and additions, measured from your consent drawings and laid out the way builders price.

Get a quote

Send your plans for a painting estimate

Upload your drawings and we will reply with a fixed fee and turnaround before any work starts. No obligation.

  • — PDF, DWG and ZIP accepted
  • — Fees in NZD, excluding GST
  • — Prefer email? Use the link in the footer

We reply with a fixed fee and turnaround before starting.

Get a QuoteEmail Us